At the Hayfield Farm HCA General Meeting, there was an update on the Stormwater Pipe Project.  Click on image on the left to view the presentation.  Here are some highlights from the meeting:

  • Washington Gas hopes to complete work in January 2018
  • Some utilities (Dominion Electric; Cox; Verizon) will be doing work soon.
  • Sanitary sewer work/reporting is progressing.
  • Some utility work, e.g., water, etc., will occur during pipe installation.
  • There probably will be additional inroads into the medians, especially at the lower (pool) end of the project.
  • Estimate of construction to install the stormwater pipe is September 2018 through September 2019.
  • Next update from Dave Anglin (Project Manager) is planned for the January 17, 2018 HCA meeting.

More details will be in the November newsletter.